Cesspool Conversions Hawaii

Cesspool 101

Never thought about where your toilet goes? You're in good company. Here's the whole thing in plain language, no plumbing degree required.

The three words you need

Cesspool: an underground pit, often lined with rock or concrete rings and open at the bottom, that collects everything from your toilets, showers and sinks. It doesn't treat anything. The wastewater just soaks into the surrounding ground.

Septic tank: a sealed, watertight tank. Wastewater sits in it long enough for heavy solids to sink to the bottom (sludge) and grease and light stuff to float to the top (scum). The clearer liquid in the middle flows out.

Leach field (also called a drain field): a set of perforated pipes laid in trenches of gravel. The liquid from the tank trickles out of the pipes, and the soil underneath acts as a natural filter before the water reaches groundwater.

Cesspool versus septic system diagramLeft: a house drains into a cesspool, an open-bottom pit where untreated wastewater soaks straight into the ground toward groundwater. Right: a house drains into a septic tank where solids settle and scum floats, then liquid flows to a leach field of perforated pipes in gravel, and the soil filters it. Cesspool (old way) Septic system (new way) Groundwater → streams & ocean House Rawsewage Hole with noreal treatment;it just soaks in Cleaner water reaches groundwater House 1. Septic tankliquidsolids settlescum floats 2. Leach fieldperforated pipes in gravel 3. Soil filters it
A cesspool lets raw wastewater soak into the ground. A septic system settles out solids in a tank, then spreads the liquid through a leach field so the soil can filter it.

Why Hawaii is converting

Hawaii has roughly 83,000 cesspools, including about 48,600 on Hawaii Island, 14,300 on Kauai, 11,000 on Maui, 7,500 on Oahu and 1,400 on Molokai (Cesspool Conversion Working Group final report, 2022). Because cesspools release untreated wastewater, they can affect drinking water, streams and coastal waters (Hawaii DOH).

Priority levels

University of Hawaii researchers rank every cesspool as Priority 1, 2 or 3 based on risk to drinking water wells, streams, coastlines and groundwater. On Oahu about 64% are Priority 1 (CCWG briefing). You can look up your area on the Hawaii Cesspool Prioritization Tool.

Your options

Which one works depends on your lot. That's what the site evaluation figures out.

How a conversion works

  1. Site evaluation: locate the cesspool and check soil, lot size and groundwater.
  2. Design: a Hawaii-licensed professional engineer designs the system to Department of Health rules.
  3. Permit: the design is submitted to the DOH Wastewater Branch for approval.
  4. Install: a licensed contractor installs the new system and properly closes the old cesspool.
  5. Inspection: final inspection and DOH approval to use.

Approved system options

The Hawaii Department of Health approves several kinds of replacement systems (DOH IWS). Here they are from most advanced (and generally most expensive) to most economical. Your lot decides which ones are possible.

  1. Aerobic treatment unit (ATU) with nitrogen removal, plus disinfection. An air pump feeds bacteria that break waste down much more completely and remove nitrogen; UV or chlorine kills germs. Best for Priority 1 areas, shallow groundwater, and sites near the coast, wells or streams. Units discharging directly to groundwater must be certified to NSF/ANSI 245 for nitrogen reduction (DOH allowed technologies). Requires a service contract with inspections every 6 months (HAR 11-62-33.1) and uses electricity. Expect the high end of costs; operating costs run up to about $108/month for the most involved setups (CCWG briefing).
  2. Bioreactor garden. Water leaving a septic tank flows through a lined garden where plants and microbes remove nitrogen. Approved in several sizes for nutrient-sensitive sites (DOH allowed technologies). Cost not published.
  3. Standard ATU (NSF/ANSI 40 Class I). Same idea as above without the extra nitrogen removal. Used where poor soil, a high water table or a shoreline location rule out a basic leach field (Golden Penny guide). Same service-contract rules (HAR 11-62-33.1). Priced by custom quote.
  4. Septic tank plus an advanced passive field (for example Eljen or Presby). Fabric and sand modules treat the water further so the field can be smaller, which helps on small lots and marginal soil (DOH allowed technologies). Maintenance is tank pumping. Cost not published.
  5. Sewer connection. Only where a public sewer is available; the counties decide where sewer goes (CCWG briefing). Hookup cost not published.
  6. Conventional septic tank with leach field, bed or seepage pit. The simplest option for lots with decent soil and enough depth to groundwater. Lowest operating cost, about $33/month at the low end (CCWG briefing).

Costs we can cite: DOH's historical septic and ATU installs ranged from about $10,000 (10th percentile) to $38,000 (90th percentile), averaging $23,000 (CCWG briefing); the full range runs from $9,000 to $60,000 or more (DOH finance report). A typical Oahu conversion runs $30,000 to $60,000 (Wastewater Conversations in Hawaii 2025). Your actual cost depends on your lot.

What about composting or incinerating toilets? They're DOH-approved, but they only handle toilet waste. Your shower, sink and laundry water still needs an approved treatment system, so they can't replace a cesspool on their own (DOH IWS).

Every system needs a Hawaii-licensed civil engineer, a percolation test and DOH plan approval (DOH allowed technologies).

Funding (as of October 2026)

We give a property-specific estimate after a free site survey.

FAQ

Is a cesspool the same as a septic tank?No. A cesspool is a pit that lets untreated wastewater soak into the ground. A septic tank is a sealed tank that separates solids, and it sends the liquid to a leach field where the soil filters it.
What is the deadline to convert my cesspool?Act 125 (2017) requires all cesspools in Hawaii to be upgraded, converted or connected to sewer by 2050. A state working group recommended earlier dates of 2030 for Priority 1 and 2035 for Priority 2, but those are recommendations, not law.
How do I find out my cesspool's priority level?Use the University of Hawaii Sea Grant Hawaii Cesspool Prioritization Tool at seagrant.soest.hawaii.edu/cesspools-tool.
Who designs and approves a new system?A Hawaii-licensed professional engineer designs it, and the Hawaii Department of Health Wastewater Branch reviews and approves it before and after installation.
Is there funding?It depends on your island. As of October 2026, Kauai offers County Grant 2 (up to $20,000, deadline Oct 23, 2026), Hawaii County offers a pilot grant of up to $30,000 per project, and a USDA-backed 1% loan is listed for Maui. Oahu has no county grant. A statewide low-interest or forgivable loan program under Act 120 (2026) is being set up by the Hawaii Green Infrastructure Authority and is not yet accepting applications.
How much does a conversion cost?It depends on your lot, soil and system type. We give a property-specific estimate after a free site survey.

Want to know what your property needs?

Book a free site survey